Km 160 Maharlika Road, Brgy. Malasin, San Jose City, Nueva Ecija 3121 0917 779 1039 (044) 958-0570 engr_garma0908@yahoo.com
Projects

Completed and ongoing work

Substations, transmission and distribution lines, renewable energy plants, telecom site power, hospitals and government projects across the Philippines.

Showing 37 of 37 projects

Permanent Power Access, 500 Sites (Phase 1 and 2), North Luzon Completed
Telecoms

Permanent power access for 500 telecom sites.

Client
DITO Telecommunity Corp.
Location
North Luzon
MV and HV Substation Package, 139.93MWp Lucanin Solar Power Plant, Brgy. Lucanin, Mariveles, Bataan Ongoing
Substations

Medium-voltage and high-voltage substation package.

Client
Citicore
Location
Brgy. Lucanin, Mariveles, Bataan
CAPA II Substation, 34.5kV System and 115kV Tower Replacement, Caparispisan, Pagudpud, Ilocos Norte Completed
Substations

Design and build of an 80MVA substation with control room, a 34.5kV MV distribution system and 115kV tower replacement. Recorded in the company profile as the single largest completed contract.

Client
ACEN
Location
Caparispisan, Pagudpud, Ilocos Norte
113MWp Binalonan PV Farm and Substation, Brgy. Sta. Catalina, Binalonan, Pangasinan Ongoing
Substations

PV farm and substation project.

Client
Megawide / Citicore
Location
Brgy. Sta. Catalina, Binalonan, Pangasinan
Transmission Line Package, 72MWp Bolbok 1 and 105MWp Bolbok 2, Bolbok, Tuy, Batangas Ongoing
Transmission and Distribution

Transmission line package for the Bolbok 1 and Bolbok 2 solar projects.

Location
Bolbok, Tuy, Batangas
North Luzon Substation Upgrading, Laoag, Bauang, San Esteban and Bacnotan Ongoing
Substations

North Luzon substation upgrading, including the Pinili and Currimao substation projects.

Client
NGCP
Location
Laoag, Bauang, San Esteban and Bacnotan
Permanent Power Access and CEF Riser Installation, 81 Sites, North and South Luzon Completed
Telecoms

Permanent power access and CEF riser installation for 81 common tower sites.

Client
ISON / Smart Common Tower
Location
North and South Luzon
69kV Transmission Line, Ajuy 57MW PV Solar, Ajuy, Iloilo Completed
Transmission and Distribution

Supply and installation of materials and works for the 69kV transmission line of the Ajuy 57MW PV solar EPC project.

Location
Ajuy, Iloilo
New 230kV Substation, TBEA Cawag 145MWp Solar Power Plant, Cawag, Subic, Zambales Ongoing
Substations

New 230kV substation and electrical equipment installation at the existing substation.

Client
TBEA
Location
Cawag, Subic, Zambales
125MWp Sta. Barbara Solar Power Plant Substation, Brgy. Balingueo, Sta. Barbara, Pangasinan Completed
Substations

Substation works for the 125MWp Sta. Barbara Solar Power Plant.

Client
Megawide / Citicore
Location
Brgy. Balingueo, Sta. Barbara, Pangasinan
Telecom Tower Sites (42 Sites), North and South Luzon Ongoing
Telecoms

Client
EdgePoint Tower Inc.
Location
North and South Luzon
Permanent Power for Cell Sites, North Luzon Completed
Telecoms

Permanent power for Globe cell sites in the North Luzon area.

Client
Globe Telecom Inc.
Location
North Luzon
3.8km 69kV Transmission Line, 30MW AC SJC Solar Power Project, Saranay, San Jose City, Nueva Ecija Ongoing
Transmission and Distribution

Design, construction, testing and commissioning of a 3.8km 69kV transmission line.

Client
SJC Solar Power Corporation
Location
Saranay, San Jose City, Nueva Ecija
Permanent Power Access, 20 Sites, North and South Luzon Completed
Telecoms

Permanent power access for 20 tower sites.

Location
North and South Luzon
2.8km 69kV Sub-Transmission Line, New Vigan Substation, Ilocos Sur Ongoing
Transmission and Distribution

Materials and labor for the 2.8km 69kV sub-transmission line.

Client
Ilocos Sur Electric Cooperative (ISECO)
Location
Ilocos Sur
Single-Phase to Three-Phase Primary Line Conversion, 2.185km, Brgy. Sto. Tomas, Barotac Viejo, Iloilo Completed
Transmission and Distribution

Conversion of a 2.185-kilometer single-phase primary line to a three-phase primary line.

Location
Brgy. Sto. Tomas, Barotac Viejo, Iloilo
Construction of Dialysis Center, Christianville Subd., Brgy. Abar 1st, San Jose City, Nueva Ecija Ongoing
Government

Government project: construction of a dialysis center.

Location
Christianville Subd., Brgy. Abar 1st, San Jose City, Nueva Ecija
100-Meter Meteorological Mast, Tower A, Cabangan, Zambales Completed
Solar and Wind

Construction of a 100-meter meteorological mast (met mast) tower.

Client
Haraya Wind Energy Corp.
Location
Cabangan, Zambales
1.8km 69kV Sub-Transmission Line, New Candon Substation, Ilocos Sur Ongoing
Transmission and Distribution

Materials and labor for the 1.8km 69kV sub-transmission line.

Client
Ilocos Sur Electric Cooperative (ISECO)
Location
Ilocos Sur
Wind Measurement Campaign, Haraya IV Offshore Wind Project, Ilog, Negros Occidental Completed
Solar and Wind

Negros Occidental wind measurement campaign for the Haraya IV Negros Occidental offshore wind project.

Location
Ilog, Negros Occidental
Telecom Tower Sites (39 Sites), South and North Luzon Ongoing
Telecoms

Client
Frontier Towers Associates Philippines
Location
South and North Luzon
Permanent Power Access, 17 Sites, North and South Luzon Completed
Telecoms

Permanent power access for 17 tower sites.

Location
North and South Luzon
Primary Line Extension and 3 x 167kVA Transformers, Quiricada St., Santa Cruz, Manila Ongoing
Hospitals

Supply and installation of a primary line extension and three 167kVA transformers.

Client
San Lazaro Hospital
Location
Quiricada St., Santa Cruz, Manila
Main Power Line and 3 x 500kVA Transformers, 5-Storey Building, San Fernando, Pampanga Completed
Hospitals

Main power line for the laundry, cold storage and CSSD, including supply and installation of three 500kVA transformers with complete electrical accessories, wires, main distribution panel, primary and secondary lines, main panel board, main feeder line and platform.

Client
Jose B. Lingad Memorial General Hospital
Location
San Fernando, Pampanga
Temporary Facility Management Area, Terra Solar, Brgy. Makabaklay, Gapan City, Nueva Ecija Completed
Solar and Wind

Construction of the management area for the temporary facility.

Client
Terra Solar Philippines
Location
Brgy. Makabaklay, Gapan City, Nueva Ecija
Permanent Power Access, 16 Sites, North Luzon Completed
Telecoms

Permanent power access for 16 Globe Telecom sites.

Client
Globe Telecom
Location
North Luzon
Work period
January 2022 to present
Permanent Power Access, Common Tower (20 Sites), North Luzon Completed
Telecoms

Permanent power access for 20 common tower sites.

Location
North Luzon
Three-Phase Primary Line Extension and 3 x 167kVA Transformers, Brgy. Makabaklay, Gapan City, Nueva Ecija Completed
Transmission and Distribution

Extension of a three-phase primary line and installation of three 167kVA distribution transformers.

Client
Geo Harbour Construction Philippines Inc.
Location
Brgy. Makabaklay, Gapan City, Nueva Ecija
Telecom Sites (27 Sites), Mindanao Ongoing
Telecoms

Client
Huawei Technologies Phils. Inc.
Location
Mindanao
Three-Phase Power System, MRF, Bantay, Ilocos Sur Completed
Government

Supply and installation of a three (3) phase power system.

Location
MRF, Bantay, Ilocos Sur
2.984km Three-Phase Distribution Line Extension, Binalonan, Pangasinan Completed
Transmission and Distribution

Extension of a 2.984km three-phase distribution line.

Client
North Luzon Aero Industrial Park Corp.
Location
Binalonan, Pangasinan
Work period
April to June 2021
Construction and Pull-out of Existing Electrical Facilities, Muñoz to Lupao, Nueva Ecija Completed
Transmission and Distribution

Labor for the construction and pull-out of existing electrical facilities.

Location
Muñoz to Lupao, Nueva Ecija
Maxxpro Project, Gapan City, Nueva Ecija Completed
Solar and Wind

Location
Gapan City, Nueva Ecija
60MVA Power Transformer Substation, ARECO Solar Power Plant, Bacolod City Completed
Substations

Assembly and testing of a 60MVA power transformer substation.

Client
ARECO Solar Power Plant
Location
Bacolod City
MDP, Cable Tray and Main Feeder, Quezon City, Metro Manila Completed
Hospitals

Supply, delivery and installation of the main distribution panel, cable tray and main feeder.

Client
World Citi Medical Center
Location
Quezon City, Metro Manila
Relocation and Re-routing of Concrete Poles for Primary Line, NFA Compound, Cabanatuan City Completed
Government

Supply and delivery of labor and materials for the relocation and re-routing of concrete poles.

Location
NFA Compound, Cabanatuan City
AC Upgrade External, 137 Sites, Nueva Ecija and Tarlac Completed
Telecoms

External AC upgrade works across 137 sites.

Client
Smart Communications Inc.
Location
Nueva Ecija and Tarlac
Work period
July 2019 to December 2021

Planning a similar project?

Share the scope, location and schedule. Our team will review your request and contact you.