Completed
Permanent power access for 500 telecom sites.
- Client
- DITO Telecommunity Corp.
- Location
- North Luzon
Substations, transmission and distribution lines, renewable energy plants, telecom site power, hospitals and government projects across the Philippines.
Showing 7 of 37 projects
Completed
Permanent power access for 500 telecom sites.
Ongoing
Medium-voltage and high-voltage substation package.
Completed
Design and build of an 80MVA substation with control room, a 34.5kV MV distribution system and 115kV tower replacement. Recorded in the company profile as the single largest completed contract.
Ongoing
PV farm and substation project.
Ongoing
Transmission line package for the Bolbok 1 and Bolbok 2 solar projects.
Ongoing
North Luzon substation upgrading, including the Pinili and Currimao substation projects.
Completed
Permanent power access and CEF riser installation for 81 common tower sites.
Completed
Supply and installation of materials and works for the 69kV transmission line of the Ajuy 57MW PV solar EPC project.
Ongoing
New 230kV substation and electrical equipment installation at the existing substation.
Completed
Substation works for the 125MWp Sta. Barbara Solar Power Plant.
Ongoing
Completed
Permanent power for Globe cell sites in the North Luzon area.
Ongoing
Design, construction, testing and commissioning of a 3.8km 69kV transmission line.
Completed
Permanent power access for 20 tower sites.
Ongoing
Materials and labor for the 2.8km 69kV sub-transmission line.
Completed
Conversion of a 2.185-kilometer single-phase primary line to a three-phase primary line.
Ongoing
Government project: construction of a dialysis center.
Completed
Construction of a 100-meter meteorological mast (met mast) tower.
Ongoing
Materials and labor for the 1.8km 69kV sub-transmission line.
Completed
Negros Occidental wind measurement campaign for the Haraya IV Negros Occidental offshore wind project.
Ongoing
Completed
Permanent power access for 17 tower sites.
Ongoing
Supply and installation of a primary line extension and three 167kVA transformers.
Completed
Main power line for the laundry, cold storage and CSSD, including supply and installation of three 500kVA transformers with complete electrical accessories, wires, main distribution panel, primary and secondary lines, main panel board, main feeder line and platform.
Completed
Construction of the management area for the temporary facility.
Completed
Permanent power access for 16 Globe Telecom sites.
Completed
Permanent power access for 20 common tower sites.
Completed
Extension of a three-phase primary line and installation of three 167kVA distribution transformers.
Ongoing
Completed
Supply and installation of a three (3) phase power system.
Completed
Extension of a 2.984km three-phase distribution line.
Completed
Labor for the construction and pull-out of existing electrical facilities.
Completed
Completed
Assembly and testing of a 60MVA power transformer substation.
Completed
Supply, delivery and installation of the main distribution panel, cable tray and main feeder.
Completed
Supply and delivery of labor and materials for the relocation and re-routing of concrete poles.
Completed
External AC upgrade works across 137 sites.
Share the scope, location and schedule. Our team will review your request and contact you.