Km 160 Maharlika Road, Brgy. Malasin, San Jose City, Nueva Ecija 3121 0917 779 1039 (044) 958-0570 engr_garma0908@yahoo.com
Projects

Completed and ongoing work

Substations, transmission and distribution lines, renewable energy plants, telecom site power, hospitals and government projects across the Philippines.

Showing 9 of 37 projects

Transmission Line Package, 72MWp Bolbok 1 and 105MWp Bolbok 2, Bolbok, Tuy, Batangas Ongoing
Transmission and Distribution

Transmission line package for the Bolbok 1 and Bolbok 2 solar projects.

Location
Bolbok, Tuy, Batangas
69kV Transmission Line, Ajuy 57MW PV Solar, Ajuy, Iloilo Completed
Transmission and Distribution

Supply and installation of materials and works for the 69kV transmission line of the Ajuy 57MW PV solar EPC project.

Location
Ajuy, Iloilo
3.8km 69kV Transmission Line, 30MW AC SJC Solar Power Project, Saranay, San Jose City, Nueva Ecija Ongoing
Transmission and Distribution

Design, construction, testing and commissioning of a 3.8km 69kV transmission line.

Client
SJC Solar Power Corporation
Location
Saranay, San Jose City, Nueva Ecija
2.8km 69kV Sub-Transmission Line, New Vigan Substation, Ilocos Sur Ongoing
Transmission and Distribution

Materials and labor for the 2.8km 69kV sub-transmission line.

Client
Ilocos Sur Electric Cooperative (ISECO)
Location
Ilocos Sur
Single-Phase to Three-Phase Primary Line Conversion, 2.185km, Brgy. Sto. Tomas, Barotac Viejo, Iloilo Completed
Transmission and Distribution

Conversion of a 2.185-kilometer single-phase primary line to a three-phase primary line.

Location
Brgy. Sto. Tomas, Barotac Viejo, Iloilo
1.8km 69kV Sub-Transmission Line, New Candon Substation, Ilocos Sur Ongoing
Transmission and Distribution

Materials and labor for the 1.8km 69kV sub-transmission line.

Client
Ilocos Sur Electric Cooperative (ISECO)
Location
Ilocos Sur
Three-Phase Primary Line Extension and 3 x 167kVA Transformers, Brgy. Makabaklay, Gapan City, Nueva Ecija Completed
Transmission and Distribution

Extension of a three-phase primary line and installation of three 167kVA distribution transformers.

Client
Geo Harbour Construction Philippines Inc.
Location
Brgy. Makabaklay, Gapan City, Nueva Ecija
2.984km Three-Phase Distribution Line Extension, Binalonan, Pangasinan Completed
Transmission and Distribution

Extension of a 2.984km three-phase distribution line.

Client
North Luzon Aero Industrial Park Corp.
Location
Binalonan, Pangasinan
Work period
April to June 2021
Construction and Pull-out of Existing Electrical Facilities, Muñoz to Lupao, Nueva Ecija Completed
Transmission and Distribution

Labor for the construction and pull-out of existing electrical facilities.

Location
Muñoz to Lupao, Nueva Ecija

Planning a similar project?

Share the scope, location and schedule. Our team will review your request and contact you.