Km 160 Maharlika Road, Brgy. Malasin, San Jose City, Nueva Ecija 3121 0917 779 1039 (044) 958-0570 engr_garma0908@yahoo.com
Projects

Completed and ongoing work

Substations, transmission and distribution lines, renewable energy plants, telecom site power, hospitals and government projects across the Philippines.

Showing 13 of 37 projects

MV and HV Substation Package, 139.93MWp Lucanin Solar Power Plant, Brgy. Lucanin, Mariveles, Bataan Ongoing
Substations

Medium-voltage and high-voltage substation package.

Client
Citicore
Location
Brgy. Lucanin, Mariveles, Bataan
113MWp Binalonan PV Farm and Substation, Brgy. Sta. Catalina, Binalonan, Pangasinan Ongoing
Substations

PV farm and substation project.

Client
Megawide / Citicore
Location
Brgy. Sta. Catalina, Binalonan, Pangasinan
Transmission Line Package, 72MWp Bolbok 1 and 105MWp Bolbok 2, Bolbok, Tuy, Batangas Ongoing
Transmission and Distribution

Transmission line package for the Bolbok 1 and Bolbok 2 solar projects.

Location
Bolbok, Tuy, Batangas
North Luzon Substation Upgrading, Laoag, Bauang, San Esteban and Bacnotan Ongoing
Substations

North Luzon substation upgrading, including the Pinili and Currimao substation projects.

Client
NGCP
Location
Laoag, Bauang, San Esteban and Bacnotan
New 230kV Substation, TBEA Cawag 145MWp Solar Power Plant, Cawag, Subic, Zambales Ongoing
Substations

New 230kV substation and electrical equipment installation at the existing substation.

Client
TBEA
Location
Cawag, Subic, Zambales
Telecom Tower Sites (42 Sites), North and South Luzon Ongoing
Telecoms

Client
EdgePoint Tower Inc.
Location
North and South Luzon
3.8km 69kV Transmission Line, 30MW AC SJC Solar Power Project, Saranay, San Jose City, Nueva Ecija Ongoing
Transmission and Distribution

Design, construction, testing and commissioning of a 3.8km 69kV transmission line.

Client
SJC Solar Power Corporation
Location
Saranay, San Jose City, Nueva Ecija
2.8km 69kV Sub-Transmission Line, New Vigan Substation, Ilocos Sur Ongoing
Transmission and Distribution

Materials and labor for the 2.8km 69kV sub-transmission line.

Client
Ilocos Sur Electric Cooperative (ISECO)
Location
Ilocos Sur
Construction of Dialysis Center, Christianville Subd., Brgy. Abar 1st, San Jose City, Nueva Ecija Ongoing
Government

Government project: construction of a dialysis center.

Location
Christianville Subd., Brgy. Abar 1st, San Jose City, Nueva Ecija
1.8km 69kV Sub-Transmission Line, New Candon Substation, Ilocos Sur Ongoing
Transmission and Distribution

Materials and labor for the 1.8km 69kV sub-transmission line.

Client
Ilocos Sur Electric Cooperative (ISECO)
Location
Ilocos Sur
Telecom Tower Sites (39 Sites), South and North Luzon Ongoing
Telecoms

Client
Frontier Towers Associates Philippines
Location
South and North Luzon
Primary Line Extension and 3 x 167kVA Transformers, Quiricada St., Santa Cruz, Manila Ongoing
Hospitals

Supply and installation of a primary line extension and three 167kVA transformers.

Client
San Lazaro Hospital
Location
Quiricada St., Santa Cruz, Manila
Telecom Sites (27 Sites), Mindanao Ongoing
Telecoms

Client
Huawei Technologies Phils. Inc.
Location
Mindanao

Planning a similar project?

Share the scope, location and schedule. Our team will review your request and contact you.